Digital Assets, Blockchain Technology & Cryptocurrencies

The Public Utility Commission of Texas (PUC) has adopted 16 TAC § 25.114 (available here), requiring certain virtual currency mining facilities (VCMFs) to register as “large flexible loads” if they receive more than 75 MW of retail electricity in the ERCOT region and have an interruptible load of at least 10% of the